Support your information and make sure all information sources are appropriately cited.
WAN Technologies Paper: Research Point-to-Point (dedicated), Packet Switched, and Circuit Switched WAN protocols/circuits/types. Define each protocol and describe at least two data transmission technologies associated with the protocol. Include the bandwidth limitations of each technology and protocol.
Support your information and make sure all information sources are appropriately cited.
The paper must use APA 6th ed., 7th printing formatting and contain a title page, 2 pages of content, and a minimum of two peer-reviewed references.
Save your time - order a paper!
Get your paper written from scratch within the tight deadline. Our service is a reliable solution to all your troubles. Place an order on any task and we will take care of it. You won’t have to worry about the quality and deadlines
Order Paper NowYour assignment will be graded based on the rubric, which can be viewed when clicking on the assignment submission link above.
Assignment Information Resource(s):
- Network Protocols Handbook– Javvin Technologies, Inc. Network Protocols Handbook
WAN Protocols and Connection Technologies – Cisco IOS
Duration: (36:19)
User: n/a – Added: 5/11/11
WAN Protocols and Connection Technologies – Cisco IOS. Frame Relay, Broadband, Cable, DSL, Fiber, FTTH, FTTP, L2TP, PPTP, encapsulation, protocols, ..
2.CASE STUDY: GREENFIELDS THE UNIVERSITY OF GREENFIELDS
The University of Greenfields would like to expand their civil engineering department and have been seeking a suitable location to construct an integrated administrative and teaching complex.
The buildings will have lecture theatre and tutorial rooms, accommodation and administrative facilities and should ideally be within a 3 mile radius of the main university campus.
A major design requirement is that BREEAM environmental standards are met. BREEAM, (Building Research Establishments Ltd Environmental Assessment Method) which helps further education colleges to set environmental targets, is not only important to the University but to Local Government also and will have a major influence in obtaining planning permission.
The local council has proposed a disused factory site, the Car Build Industrial Estate. Although the site is now derelict and will require clearing before any construction can take place it is just 2 miles from the University main buildings providing ease of access between departments. The site is close to a recently extended main road connecting Greenfields town center with a large housing development, Newtown, which has a reliable and frequent public transport service.
As part of a national conservation initiative, supported by the University, a cycle path has been built along an old drained canal route which runs from the town center, along the perimeter of the Industrial Estate and onto Newtown.
The expansion of the University has attracted a lot of publicity and strong feeling both for and against the development. The business community sees the increase in student population as very positive whilst residents of Newtown are concerned that the increased traffic will cause excessive congestion. In addition, a local environmental group have raised the problem of site clearance saying that Car Build Industrial Estate had been used for the disposal of hazardous material. The Group say that although the material is safe if undisturbed, removing it will necessitate quarantining the area and closing the cycle way and half of the adjoining main road for some 3 months.
You have been hired as the new risk Lead for this project and have been asked to implement a realistic management process. With the project being in a very early stage estimates of time and cost are considered unreliable but guidance on obtaining more accurate estimates is needed.