Homework # 2 (10 points)
You work for a company that manufactures aluminum rods in the machine shop. The aluminum rods must be 601 mm +/-4 mm long to meet customer’s specifications. There has been a chronic problem with rods length being out of specifications causing high scrap and rework rates.
Save your time - order a paper!
Get your paper written from scratch within the tight deadline. Our service is a reliable solution to all your troubles. Place an order on any task and we will take care of it. You won’t have to worry about the quality and deadlines
Order Paper NowFor a month, data was collected on the length of 30 aluminum rods in the machine shop. Also, three suppliers A, B and C that manufacture the same part, collected data on 30 aluminum rods at their own facilities (see data below).
Machine Shop |
Supplier A |
Supplier B |
Supplier C |
599 |
602.1 |
601 |
603 |
600 |
604.0 |
600.1 |
601 |
609 |
603.7 |
605.9 |
601 |
603 |
606.4 |
602.8 |
600 |
600 |
605.7 |
604 |
605 |
601.3 |
605.3 |
604 |
604 |
601.2 |
603.2 |
602 |
603 |
600.5 |
606.9 |
600 |
602 |
601.6 |
605.5 |
602.2 |
602 |
603 |
603.7 |
603.1 |
599 |
598.1 |
604.6 |
600.2 |
606 |
603 |
603.3 |
604 |
600 |
602.1 |
606.9 |
599.9 |
601 |
604 |
605.9 |
600 |
603 |
577.6 |
603.1 |
603 |
600 |
607 |
607.7 |
601.4 |
605 |
602 |
603.3 |
602.5 |
604 |
603 |
605.3 |
603.7 |
604 |
601.5 |
604.1 |
603.9 |
602 |
604.6 |
603.8 |
602 |
600 |
601.1 |
602.5 |
600 |
599 |
602.5 |
606.9 |
607 |
600 |
603.1 |
607.8 |
609 |
601 |
600 |
605.9 |
608 |
602 |
604.1 |
604.5 |
606.3 |
603 |
591.7 |
603.1 |
605.7 |
603 |
589.1 |
606.1 |
601.1 |
607 |
605.3 |
602.6 |
606 |
601 |
600.9 |
604.1 |
602 |
603 |
598.0 |
603.4 |
605 |
604 |
Question:
Should the company continue producing aluminum rods or buy parts from outside suppliers? You have been asked to lead a problem-solving team and recommend a solution. Hint:
You must run the following analysis, study results and make a recommendation:
· Run a normality test for the machine shop and each supplier A, B and C data set
· Perform a Process Capability Analysis for the machine shop, supplier A, B, and C
· Approximate Sigma level for the machine shop, supplier A, B and C (Use
Cpks)
· Calculate Cp to determine how much the machine shop and each supplier (A, B and C) sample is consuming out of the spec.
· Scrap cost for the machine shop and each supplier A, B and C (Use Taguchi analysis)
|
· Run ¯¯ and R chart for the machine shop, supplier A, B, and C